Traffic Pattern Change on Keller Springs Road

Published on October 16, 2025

59404990d6b832ad424cdc634df78d1dc814c5841b4cc2a6b06e4a24ecc40653.jpeg

Work is progressing on the Keller Springs Road Revitalization Project, which extends from the Dallas North Tollway southbound service road to Addison Road. The next phase includes installing new water and sanitary sewer mains along the south side of Keller Springs Road between Quorum Drive and Addison Road.

 

Beginning Thursday, October 16, traffic will shift to the northern lanes, with one lane open in each direction between Addison Road and Quorum Drive.

 

Please use caution when driving through the area and follow all posted signs indicating the new traffic pattern.

Tagged as: