Engineering

The Engineering Division provides planning, engineering, and maintenance services for Addison's infrastructure including streets, traffic signals, drainage, water and wastewater. We oversee implementation of capital improvements, and provide thorough engineering review of all new developments and inspection services for construction projects. We strive to integrate community concern into each project managed and reviewed.
Capital Improvement Projects: streets, traffic lights, airport
| Design Standards |
| Master Plans |
| Survey Monuments |
| Required Items for a Preconstruction Meeting |
|
Maintenance Bond
The maintenance bond is due prior to final acceptance of the project. The maintenance bond is typically submitted by the general contractor but may be submitted by the property owner. The bond shall be for a period of two years beginning with the date of final acceptance by the Town of Addison.
The valuation of the bond shall be:
- 100% when the cost of construction of the public infrastructure is less than or equal to $5000
- $5000 when the cost is greater than $5000 but less than $50,000
- 10% when the cost is greater than $50,000