Capital Improvements

Capital Improvements

Capital Improvements

Streets

  • ADDISON ROAD PAVEMENT AND DRAINAGE IMPROVEMENTS PHASE I:  Currently under construction, this project widens Addison Road, adding a continuous left turn lane between Belt Line Road and Arapaho Road.  Replacing a structurally failing asphalt street with a concrete one, will vastly improve the efficiency of the Addison Rd. / Arapaho Rd. intersection.  New street lights, sidewalks, and landscaping will be installed.  Expected completion:  February 2008.
  • ADDISON ROAD PAVEMENT AND DRAINAGE IMPROVEMENTS PHASE II:  Addison Road will be widened, adding a continuous left turn lane between Arapaho Road and Keller Springs and replacing a structurally failing asphalt street with a concrete one.  New street lights, sidewalks, and landscaping will be installed.
  • BELT LINE ROAD STREETSCAPE IMPROVEMENTS:  This project will consist of updating the streetscape, street lights, bus stops, and sidewalks of Belt Line Road.  The project is intended to improve pedestrian safety and beautify the street.  This project is currently under conceptual design.
  • BROOKHAVEN CLUB DRIVE PAVEMENT AND DRAINAGE IMPROVEMENTS:  Generated by proposed redevelopment of the Brookhaven area, this project includes complete reconstruction of Brookhaven Club Drive replacing all pavement, drainage, and utility infrastructure.  Parallel parking will be added at strategic locations as well as streetscape, sidewalks and new street lights.


Traffic Signals

  • TRAFFIC SIGNAL UPGRADES:  The existing controllers for the Town's traffic signals will be upgraded, providing the ability to improve their timing consistency and to troubleshoot and adjust signals remotely.  Project is currently under design.


Airport

  • AIRPORT FUEL FARM PAVEMENT IMPROVEMENTS:  With the recent completion of the Airport Fuel Farm, the existing pavement along the refueler alley has been found to be structurally deficient and incapable of supporting the refueler traffic.  This project includes complete reconstruction of the area pavement including all necessary drainage improvements as well.  This project is currently under design.


Water

  • 8-INCH WATER LINE REPLACEMENT:  an existing 8" cast iron water line will be replaced with an 8" PVC line, dramatically decreasing the potential for a leak in this section of pipe, improving the overall performance of Addison's water distribution system.
  • 2.0 MILLION GALLON ELEVATED WATER STORAGE RESERVOIR:  Identified in the Town of Addison Water Distribution System Study (2006), this project includes the construction of a 1.5 Million Gallon Elevated Water Storage Reservoir to satisfy the remainder of Addison's elevated storage needs.