Addison Airport Drainage Project Capital Project Summary
Addison Airport Drainage Project Capital Project Summary
Addison Weather
 | 48°F |
Addison Airport Drainage Project Capital Project Summary

Project Summary: This project will provide for re-grading of the safety area and will eliminate the drainage ditch that flows across the north end of the airport that is considered a potential obstruction to air operations. A storm sewer will be installed and the area will be graded to eliminate this potential obstruction from the runway safety area. The project will also include implementing declared distances, lighting, signs, and installing navigational aids.
Funding:
Estimated Cost: Engineering $200,000 Construction $2,000,000
90% TxDOT- Aviation 10%
Airport fund Hurdles: None
Schedule: Engineering and Construction in FY 2008
Design Engineers: Garver Engineers Contractor: None at this time.
Project Manager: Aaron Russell, P.E.
|